Walmart Fleet Development

Converted a 16,880-square-foot section of an active Walmart distribution facility into a dedicated Fleet Development training center accommodating 500+ occupants.

Project Specifications

  • 16,880-square-foot building conversion — warehouse to training/office facility
  • Occupant load of 511 across five training rooms, training/break room, open office, and private offices
  • Occupancy: Business (B) / Assembly (A-3); Construction Type II-B, fully sprinklered
  • Movable partition walls for flexible classroom configurations
  • New HVAC units serving fully conditioned training and office space
  • Acoustical ceilings, resilient and ceramic tile flooring, solid surface countertops, and plastic laminate casework throughout
  • Branded graphic wall finishes and program signage
  • New ADA-compliant exterior ramp and prefabricated metal stairs
  • Infilled dock pits, new dock door seals, and exterior wall infill at converted dock openings

McCrory converted a 16,880-square-foot section of an active Walmart distribution facility in Laurens, South Carolina into a dedicated regional training center for Walmart’s Fleet Development program, which prepares Walmart associates to become company truck drivers. The project transformed dock-door warehouse space into a fully conditioned training and office environment built to accommodate more than 500 occupants across five training rooms, a training/break room, open office, private offices, corridors, and restrooms.

Scope included full demolition of existing interior finishes, dock hardware, and dock levelers, followed by new insulated wall infill at former dock openings, new roof-mounted HVAC units, and a complete interior buildout. Training spaces feature acoustical ceiling systems, resilient and ceramic tile flooring, solid surface countertops, plastic laminate casework, and movable partition walls that allow rooms to reconfigure for different class sizes. Branded graphic wall finishes throughout reinforce the program’s “Safety. Courtesy. Pride.” identity.

Exterior work included new prefabricated metal stairs and an ADA-compliant ramp, new exterior doors, infilled dock pits, and new dock door seals — all completed while the surrounding building remained an active Walmart transportation facility.

Project Specifications

  • 16,880-square-foot building conversion — warehouse to training/office facility
  • Occupant load of 511 across five training rooms, training/break room, open office, and private offices
  • Occupancy: Business (B) / Assembly (A-3); Construction Type II-B, fully sprinklered
  • Movable partition walls for flexible classroom configurations
  • New HVAC units serving fully conditioned training and office space
  • Acoustical ceilings, resilient and ceramic tile flooring, solid surface countertops, and plastic laminate casework throughout
  • Branded graphic wall finishes and program signage
  • New ADA-compliant exterior ramp and prefabricated metal stairs
  • Infilled dock pits, new dock door seals, and exterior wall infill at converted dock openings

ADDITIONAL PROJECTS