McCrory provided construction services for the second phase of the distribution center expansion project located on TTI’s fast growing campus in Anderson, SC. The east expansion (100,000-square-feet) is constructed of load-bearing precast wall panels on a conventional slab with high bays for additional rack storage and a Ductilcrete concrete apron and drive area. This expansion began during the final stages of the 300,000-square-foot addition and was constructed during the height of the shipping season. McCrory worked closely with facility personnel to minimize interruptions to traffic flow and daily facility operations.