TTI D.C. Expansion Phase 2

While completing a 300,000-square-foot addition to TTI’s distribution center, McCrory was entrusted with a second phase on the opposite end of the facility—adding an additional 100,000 square feet.

Project Specifications

  • 100,000-square-foot warehouse expansion
  • Load-bearing precast wall panels
  • Conventional floor slab
  • Ductilecrete used for concrete apron and drive area
  • Maintained ongoing facility operations during construction
  • Project completed ahead of schedule

McCrory provided construction services for the second phase of the distribution center expansion project located on TTI’s fast growing campus in Anderson, SC. The east expansion (100,000-square-feet) is constructed of load-bearing precast wall panels on a conventional slab with high bays for additional rack storage and a Ductilcrete concrete apron and drive area. This expansion began during the final stages of the 300,000-square-foot addition and was constructed during the height of the shipping season. McCrory worked closely with facility personnel to minimize interruptions to traffic flow and daily facility operations.

 

Project Specifications

  • 100,000-square-foot warehouse expansion
  • Load-bearing precast wall panels
  • Conventional floor slab
  • Ductilecrete used for concrete apron and drive area
  • Maintained ongoing facility operations during construction
  • Project completed ahead of schedule