Red Bullet Speculative Building

A 150,000-square-foot speculative expansion was constructed adjacent to the active Pregis facility, separated by a three-hour CMU wall and delivered without disrupting ongoing operations.

Project Specifications

  • 150,000-square-foot speculative expansion
  • Pre-engineered metal building (PEMB) adjacent to and sharing a new, 3-hour CMU separation wall with existing facility
  • Six-inch concrete slab
  • 28-foot clear height at low end of sloped roof
  • Seven new dock doors to support future tenant use
  • Fire protection loop extended from existing system
  • Construction completed with no disruption to neighboring operations

Following the successful delivery of the Pregis manufacturing facility, McCrory was selected to construct a 150,000-square-foot speculative expansion on the adjacent site. The new structure shares a three-hour CMU separation wall with the existing Pregis facility—also a pre-engineered metal building (PEMB)—but was developed as a separate, leasable space intended for future industrial tenants. Built on a six-inch concrete slab, the expansion offers 28 feet of clear height at the low end of the roof slope, providing ideal functionality for warehousing or light manufacturing use.

The facility includes 7 dock doors for enhanced flexibility and tenant access, and the fire protection loop was extended from the existing line to serve the new space. A key challenge was ensuring that construction activities did not interfere with ongoing operations at the active Pregis facility next door. McCrory coordinated closely with the owner, site teams, and utility providers to phase work carefully and maintain uninterrupted access, safety, and functionality throughout the project.

This build-to-suit-ready industrial space adds strategic value to the site and showcases McCrory’s ability to deliver complex expansions within fully operational environments—on schedule, on budget, and with zero disruption to neighboring production.

Project Specifications

  • 150,000-square-foot speculative expansion
  • Pre-engineered metal building (PEMB) adjacent to and sharing a new, 3-hour CMU separation wall with existing facility
  • Six-inch concrete slab
  • 28-foot clear height at low end of sloped roof
  • Seven new dock doors to support future tenant use
  • Fire protection loop extended from existing system
  • Construction completed with no disruption to neighboring operations