During our upfit of a spec building for Gehl’s Southeast operation, McCrory was awarded a second design-build contract to renovate and expand their neighboring production facility. This called for major upgrades to mechanical and electrical equipment, as well as electrical service. The project included a new mechanical room to house pumps, chillers, and piping to deliver additional process water to new production lines; as well as foundations and pipe racks to support new cooling towers and associated piping that feed the mechanical room equipment.
Interior modifications included installation of Insulated Metal Panel (IMP) wall and ceiling panels, designed to segregate process areas to allow for a controlled environment and wash-down of critical equipment. The creation of four new transfer dock positions required structural modifications at exterior wall openings to meet the area’s seismic requirements. Throughout construction, our entire design-build team remained focused on safely executing our work without disruption to Gehl’s production schedule.