Gehl Foods Phase 2

Expansion of Gehl’s production capabilities with major MEP upgrades, IMP panels, and seismic-compliant dock modifications.

Project Specifications

  • Design-build delivery
  • Mechanical room addition - 3,486 square feet
    • Conventional steel frame with exterior IMP and CMU walls
    • 7” thick slab-on-grade with #5 bars 8” on center each way
  • Boiler room – 1,430 square feet
    • Pre-engineered metal building
    • 12” thick slab-on-grade with #5 bars 12” on center each way
  • Insulated metal panels
    • 3” exterior IMPs at Mechanical Room
    • 3”, 4” and 6” IMPs at interior walls and ceilings
  • Upgrades to electrical, fire protection and refrigeration systems
  • New truck entrance and heavy duty truck court

During our upfit of a spec building for Gehl’s Southeast operation, McCrory was awarded a second design-build contract to renovate and expand their neighboring production facility. This called for major upgrades to mechanical and electrical equipment, as well as electrical service. The project included a new mechanical room to house pumps, chillers, and piping to deliver additional process water to new production lines; as well as foundations and pipe racks to support new cooling towers and associated piping that feed the mechanical room equipment.

Interior modifications included installation of Insulated Metal Panel (IMP) wall and ceiling panels, designed to segregate process areas to allow for a controlled environment and wash-down of critical equipment. The creation of four new transfer dock positions required structural modifications at exterior wall openings to meet the area’s seismic requirements. Throughout construction, our entire design-build team remained focused on safely executing our work without disruption to Gehl’s production schedule.

Project Specifications

  • Design-build delivery
  • Mechanical room addition - 3,486 square feet
    • Conventional steel frame with exterior IMP and CMU walls
    • 7” thick slab-on-grade with #5 bars 8” on center each way
  • Boiler room – 1,430 square feet
    • Pre-engineered metal building
    • 12” thick slab-on-grade with #5 bars 12” on center each way
  • Insulated metal panels
    • 3” exterior IMPs at Mechanical Room
    • 3”, 4” and 6” IMPs at interior walls and ceilings
  • Upgrades to electrical, fire protection and refrigeration systems
  • New truck entrance and heavy duty truck court