Lexington Medical Center — Cath/IR

Renovation of Lexington Medical Center’s East Tower, adding a Cath/IR suite while maintaining safety near active ORs

Project Specifications

  • 2,857-square-foot Cath/IR procedure and Holding Areas
  • 732-square-foot corridor with 2-hour exit passageway
  • Nurses call system
  • Reconfiguration of MEP system in the main corridor
  • Significant coordination of work over surgical suites below this renovation and shutdowns for integration of life safety, med gas and nurse call systems
  • Completed with no impact to ongoing hospital operations

This project encompassed the renovation of space within the existing East Tower of the sprawling Lexington Medical Center campus in West Columbia, South Carolina. Located in close proximity to the radiology department in an area used by patients and staff during construction, McCrory completed a new Cath/Interventional Radiology procedure and holding area, along with a 2-hour exit passageway in an existing corridor. All construction activity took place directly above operating rooms and was carefully planned in order to maintain a safe environment for everyone in the area throughout the project.

Project Specifications

  • 2,857-square-foot Cath/IR procedure and Holding Areas
  • 732-square-foot corridor with 2-hour exit passageway
  • Nurses call system
  • Reconfiguration of MEP system in the main corridor
  • Significant coordination of work over surgical suites below this renovation and shutdowns for integration of life safety, med gas and nurse call systems
  • Completed with no impact to ongoing hospital operations

ADDITIONAL PROJECTS