AgFirst Data Center

Repurpose of a downtown space for AgFirst’s data hub, ensuring expansion capacity while being completed with zero unplanned downtime.

Project Specifications

  • One-story, 10,000-square-foot mission critical facility
  • Redundant building systems
  • Above standard fire-suppression engineering
  • Multiple power sources including generator and battery
  • Fail-proof communication capabilities
  • Trenched cables for a direct data connection to bank’s headquarters

Creating this mission critical data hub for AgFirst began with extensive preconstruction planning in partnership with the bank’s construction management firm, LCK. Not only did the team create a reliable, efficient building by repurposing and redeveloping an existing space, the new data center was structured to accommodate both physical expansion as well as growth of services. The structure was retrofitted within a constrained, downtown jobsite and the bank experienced zero unplanned downtime during the complex move. Cables were trenched across two busy downtown streets to create a direct connection between the data center and the bank’s headquarters.

Project Specifications

  • One-story, 10,000-square-foot mission critical facility
  • Redundant building systems
  • Above standard fire-suppression engineering
  • Multiple power sources including generator and battery
  • Fail-proof communication capabilities
  • Trenched cables for a direct data connection to bank’s headquarters